Fouten Fouten Fouten
15961836110
JIS 10K Flanged Sewage Air Release Valve

JIS 10K Flanged Sewage Air Release Valve

Product Features
JIS10K Flanged Connection
Model number
CRVZ
Specification and caliber
15A-300A
Pressure level
JIS 10K
Material
Ductile Iron Q450 / Cast Steel WCB / Stainless Steel CF8, etc.
Product Introduction
Fouten Comprehensive Valve Selection Catalog V29 (Bilingual EN/CN)
Download PDF (143 MB)
Specification Value
Model numberCRVZ
Specification and caliber15A-300A
Pressure levelJIS 10K
MaterialDuctile Iron Q450 / Cast Steel WCB / Stainless Steel CF8, etc.
Product FeaturesJIS10K Flanged Connection

Function of JIS10K Sewage Air Release Valve

The CRVZ sewage air release valve is used for air discharge and replenishment in sewage or drainage pipelines, utilizing JIS10K flanged connections, with sizes ranging from 15A to 300A. The actual structure, air release capacity, and operating range should be based on specific product technical documentation.

What is the difference between sewage conditions and clean water conditions?

Sewage may contain suspended solids, fibers, or other impurities, so attention must be paid to whether the float, air discharge channel, and internal moving parts are prone to contamination or blockage, and provisions for inspection and cleaning maintenance should be reserved.

How to choose materials?

Material options include ductile iron, WCB, and CF8, among others. Specific material grades, internal and external corrosion protection, and sealing materials must be confirmed based on the medium, temperature, pressure, and project specifications.

What needs to be confirmed for JIS10K connections?

When selecting JIS flanged products, it is necessary to verify the size, flange dimensions, sealing surfaces, and matching pipeline standards; they cannot be directly interchanged with other standard flanges based solely on the “10K” designation.

For other water system valves, see Water Control Valve Manufacturers and Selection.

How to consider the installation position of the sewage air release valve along with future cleaning?

High points of the pipeline, pressure variations, flow rates, and possible negative pressure conditions should be provided, and the layout should be confirmed in conjunction with actual air discharge requirements and product structure; the size should not be selected solely based on a proportion to the main pipeline. When fibers or debris are present, the degree of contamination should also be specified.

On-site, isolation, discharge, and cleaning passages should be reserved to avoid the air discharge outlet being obstructed by construction or insulation. In case of abnormal operation, check for contamination and blockage of the float and channel, and handle residual pressure according to procedures before maintenance.

Frequently Asked Questions

Is the filter aperture of the sewage air release valve fixed?

If the medium contains solids or fibers, further verification of the air discharge channel, anti-blocking structure, and maintenance methods should be conducted; whether to configure debris blocking or filtering facilities should be coordinated with specific products and pipeline schemes.

Is JIS10K fixed at 1.0MPa?

A single fixed pressure value should not be used to summarize all temperature and material conditions; confirmation should be made according to applicable standards and product design.

Does the sewage air release valve require regular maintenance?

Impurities in sewage may affect the operation of the float and air discharge channel, and inspections and cleaning should be scheduled based on the degree of medium contamination and operating conditions.

FOUTEN

Discuss your valve configuration and quotation

Provide a phone number or work email; at least one is required.

Additional service and connection details (optional)

Please send drawings to the official email shown on this page. This form does not accept attachments.

Home Home Valve selectionValve selection news informationnews information Contact usContact us